D-Dimer: Survey Deficiencies and CLIA Citations
Most D-Dimer citations come from five places: quality control (42 CFR 493.1256), calibration verification (42 CFR 493.1255), proficiency testing or accuracy verification, method verification (42 CFR 493.1253) and test reporting, including critical values (42 CFR 493.1291). Keep the records for each area current and you remove most of the risk.
Where D-Dimer citations come from
Survey findings about D-Dimer almost always trace to a short list of 42 CFR 493 standards. This table shows each one and the records a surveyor will usually ask to see.
| Area | Regulation | Records surveyors ask for |
|---|---|---|
| QC | 42 CFR 493.1256, 42 CFR 493.1269 | Daily D-Dimer QC records, Levey-Jennings charts, corrective action log, control lot ranges |
| Calibration verification | 42 CFR 493.1255 | Six-month D-Dimer calibration verification and reportable range data with director review |
| Accuracy verification | 42 CFR 493.1236 | Twice-yearly D-Dimer accuracy checks (external PT, split samples or reference material) with acceptance criteria |
| Method verification | 42 CFR 493.1253 | D-Dimer verification study: accuracy, precision, reportable range, reference interval check, director sign-off |
| Test report and critical values | 42 CFR 493.1291 | Critical value list, call log with read-back, report format showing D-Dimer reference intervals |
| Personnel | Subpart M | Training and competency records for everyone who runs D-Dimer |
PT status for D-Dimer
Not listed in Subpart I: no required PT, but accuracy must be verified at least twice a year (42 CFR 493.1236(c)).
Specimen problems that turn into D-Dimer findings
Preanalytical errors become citations when the lab has no written rule for them, or does not follow its own rule.
- D-dimer assays use different units (FEU vs. DDU); state units clearly on reports.
- Exclusion cutoffs are assay-specific; document the source of any cutoff you report.
If D-Dimer was cited on your survey
- Identify the exact standard cited and the records the surveyor reviewed.
- Look back at patient results that could have been affected and decide whether corrected reports are needed.
- Fix the system, not just the instance, and assign monitoring.
- Write the plan of correction. See the CLIA plan of correction guide.
Related tests
Full guide: D-Dimer testing in the clinical lab: CLIA, PT and QC requirements on soundlabconsult.com, part of the Laboratory Test Compliance Library.
Facing a statement of deficiencies?
Sound Lab Consultants helps clinical laboratories respond to statements of deficiencies, from root cause to plan of correction to revisit.
Related guides on soundlabconsult.com:
Frequently asked questions
What are the most common D-Dimer survey deficiencies?
Missing or undocumented QC, missed calibration verification, PT or accuracy verification gaps, no method verification study, and undocumented critical value calls for D-Dimer. These are general categories, not statistics.
Which regulation covers D-Dimer quality control?
42 CFR 493.1256 sets the control procedure requirements, with coagulation rules in 42 CFR 493.1269.
Is D-Dimer on the CLIA PT analyte list?
Not listed in Subpart I: no required PT, but accuracy must be verified at least twice a year (42 CFR 493.1236(c)).
Sources
- 42 CFR 493.1256, Control procedures
- 42 CFR 493.1255, Calibration and calibration verification
- 42 CFR 493.1253, Establishment and verification of performance specifications
- 42 CFR 493.1291, Test report
- 42 CFR 493.1236, Evaluation of proficiency testing performance
- CMS CLIA Year 2024 Top 10 Standard- and Condition-Level Deficiencies
- CMS State Operations Manual, Appendix C (Laboratories)